RESPONSE BOAT - MEDIUM SYSTEM
CONTRACT DATA REQUIREMENTS LIST
CONTRACT NO: HSCG23-06-D-ARB001 (See Section J - SOW 041-2)


BLK01-SEQUENCE NO.:

068-003 (Orig)

BLK03-SUBTITLE:

Allocated Configuration Baseline (ACB)

BLK04-AUTHORITY:

Technical Report - Study/Services (DI-MISC-80508A)

BLK05-CONTRACT REF:

SOW 068-2.2.2

BLK07-DD 250 REQUIRED:

LT

BLK08-APP CODE:

A

BLK09-DIST STMT REQD:

E

BLK10-FREQUENCY:

ONE/R

BLK12-DATE OF 1ST SUBM:

See BLK16

BLK13-DATE OF SUBS SUBM:

See BLK16

BLK14-DISTRIBUTION:

Electronic Copy: IPDE
Hard Copies: None

BLK15-TOTAL:

Electronic Copy: Yes
Hard Copies: 0

BLK16-REMARKS:

BLK04: Modify DID as follows:
Replace 2(c) with the following:
2(c) Content. The ACB shall be a matrix that reports the assignment of specification requirements to features, functions, components and processes of the offeror’s proposed solution. The matrix shall list the requirement reference, the requirement itself, how the requirement was fulfilled and the verification method to demonstrate compliance with the requirement. Areas of performance criteria shall report the predicted performance.

Delete 2(d).

BLK12: Initial submission is due in accordance with the Contractor-developed design review plan required by SOW 068-3.2 and documented in the Integrated Master Schedule (CDRL-041-005). Days allowed for CG review will be based on the number of phases the design review is comprised of and bounded by the following: Allow 35 days CG review on the initial submission for a design review comprised of 4 phases; Allow 10 days CG review on the initial submission for a design review comprised of 10 phases. Exact review periods will be established at contract award or negotiated as contract administration after award. If no agreement is reached, review times will default to the 4 phase review period.


BLK13: Subsequent submissions will be due based on the number of phases the design review is comprised of and bounded by the following: Due 15 DARC for a design review comprised of 4 phases; Due 10 DARC for a design review comprised of 10 phases. Days allowed for CG review will be based on the number of phases the design review is comprised of and bounded by the following: Allow 20 days CG review on the subsequent submission for a design review comprised of 4 phases; Allow 10 days CG review on the subsequent submission for a design review comprised of 10 phases. Exact review periods will be established at contract award or negotiated as contract administration after award. If no agreement is reached, review times will default to the 4 phase review period.

ATTACHMENTS:

None