BLK16-REMARKS:
|
BLK04:
Modify DID as follows:
Replace paragraph 2(c) with:
2(c) Provide information for the Coast Guard’s Life Cycle Cost Estimate (LCCE)
of the RB-M System, broken down by year, for a 20-year service life. The data
provided shall be comprehensive and structured to identify all cost elements,
primarily with respect to operations (i.e. fuel consumption) and maintenance
(organizational, intermediate, and depot level) costs. Use the rates found in
Coast Guard Instruction COMDTINST
7310.1I, Standard Rates, provided as GFI, as guidance for accumulating
the labor costs associated with the maintenance of the RB-M. Include, at a
minimum, the following life cycle cost categories:
1. Operating Costs
1.1 Fuel Consumption, assuming the hours of operation and mission profile
described in paragraph 044-4
of Attachment 2 to Section J, the Specification.
1.2 Other operating costs.
2. Scheduled Maintenance Costs
2.1 Organizational Level (O-Level) Maintenance, categorized by MPC and broken
out in terms of labor (Military/contracted) and materials.
2.2 Intermediate Level (I-Level) Maintenance, categorized by MPC/BCMP line
item and broken out in terms of labor (Military/contracted) and materials.
2.3 Depot Level (D-Level) Maintenance, categorized by BCMP line item and
broken out in terms of labor and materials.
Replace 2(d) with:
2(d) Provide the following Unscheduled Maintenance cost estimates:
1. For each CILRU on the MECL, provide:
1.1 Estimated replacement cost for the item, less shipping and handling
(should match MECL data field U/I Price).
1.2 Estimated labor hours for the remove and replace procedure developed in SOW 076 and SOW
086.
2. For each TRS identified in SOW 076 and developed in SOW 086, provide an
estimated cost to have done commercially.
BLK10: LCCE Input shall be updated and submitted quarterly until the Product
Configuration Baseline is accepted, at which time the LCCE Input shall be
updated and submitted annually for the duration of the performance period.
BLK12: First submission may be based on the Offeror's proposal, insofar as it
matches the Functional Configuration Baseline. Thereafter, submissions shall
reflect the most currently available information, including that affected by
any approved Engineering Changes.
|