Part I - The Schedule (Continued)
Section G - Contract Administration Data

G.1        [Orig]  ADDRESS OF CORRESPONDENCE

Correspondence concerning the contract shall be directed to the following addresses:

 

For US Mail delivery:

 

Commandant (G-ACS-4/SP)

M/F:  HSCG23-06-D-ARB001

U. S. Coast Guard Headquarters

2100 Second Street SW, JR11-0116

Washington, DC  20593-0001                                     

 

For commercial courier and hand-carried deliveries:

 

US Coast Guard (G-ACS-4/SP)

Attn:  SCOTT PALMER, (202)475-3239

Ref:  HSCG23-06-D-ARB001

1900 Half St. SW, Suite 11-0116

Washington, DC  20024

G.2        [Orig]  GOVERNMENT REPRESENTATIVES

G.2.1.        [Orig]  The Coast Guard may, upon contract award or thereafter, name representatives with titles such as Contracting Officer's Technical Representative (COTR), Contracting Officer’s Representative (COR), Coast Guard Acceptance Representative, etc.  Such individuals, if appointed, will be named in writing by the Contracting Officer.  The letter of appointment will indicate the individuals and their titles, and stipulate the rights, responsibilities, and limitations of their appointment.

G.2.2.        [Orig]  In any event, no such named individual has the authority to issue any direction under this contract either technical or otherwise, which constitutes a change to the terms, conditions, price or delivery schedule of the contract.  Only the Contracting Officer is authorized to alter the contract in any manner.

G.3        [Orig]  INVOICING REQUIREMENTS

G.3.1.        [Orig]  General.

G.3.1.1.         [A00052]  Invoices may be submitted as frequently as two times per month for CLIN X001, Project Management (PM) and monthly for all other CLINs, unless otherwise agreed to by the Contracting Officer.  The twice monthly billing amount for CLIN X001 is the full monthly CLIN value divided by 2.  MMC is allowed to bill the first half of the monthly amount no earlier than the 16th of the month, and the second half of the monthly amount no earlier than the 1st day of the following month.  For example, for January 2011 PM effort, MMC will be allowed to bill on 16 January 2011 and 01 February 2011. 

G.3.1.2.         [Orig]  Each invoice must correspond to a single delivery/task order and may not include charges for items/services not identified on that order.  The contract number found in block 2 of the SF 33 contract (Page A-1), and the order number found in block 3 of the OF 347 order must be included in an invoice or a request for contract financing payment for it to constitute a proper request for contract payment.

G.3.1.3.         [Orig]  Invoices shall be broken down by CLIN and sub-CLIN.  Invoices containing CLIN x003 shall be further broken down by RB-M hull number.

G.3.1.4.         [Orig]  Cost-based invoices shall be certified by the Contractor with regards to the allowable and allocable costs incurred in the performance of the work as of the last day of the invoice period.

G.3.1.5.         [Orig]  An original and two (2) information copies shall be submitted to the Project Resident Office.  Failure to submit directly to this office will delay payment.

G.3.2.        [A00059] Prompt Payment CLINs 1009, 1010, 6002, 7002, 8002, x004, x005 and x003yp (where x equals the price period and y equals the associated hull SubCLIN).  In addition to the general requirements above and the requirements of FAR 52.232-25, Prompt Payment, incorporated at Section I.1, includes evidence of Government acceptance for CLINs x004, x005, and x003yp and evidence of progress for CLINs 1009 and 1010, 6002, 7002 and 8002.  For the final Invoice of CLINs 1009,1010, 6002, 7002 and 8002, provide evidence of acceptance.

G.3.2.1.         [A00059] For Prompt Payment CLINs x003yp, the Partial Boat Grouping ECP Lot, MMC is allowed to bill the amount shown as “Allowable Partial Billings” no earlier than the “Billing Date” date shown in the billing schedule contained in Contract Section J, Attachment 11.   MMC shall attach the DD-250s as proof of delivery of the applicable boats in the partial boat grouping. 

G.3.3.        [A00059]  Performance-Based Payments CLINs 1002, x003 (where x equals the price period) and x003yc  or x003yd (where y equals the associated hull SubCLIN).  Invoicing shall comply with Section G and Section I.2, FAR clause 52.232-32, "Performance-Based Payments."

G.3.3.1.         [A00056]  For CLINs 1002 and x003, no payment will be required to be made upon invoices aggregating less than three thousand dollars ($3,000).

G.3.3.2.         [Orig]  Computation of amounts.  The Contractor shall not be entitled to payment of a request for performance-based payment prior to Contracting Officer’s acceptance of all components of the evidence/basis of payment for a milestone identified in paragraph G.4.  Unless the Contractor requests a smaller amount, the Government will compute each performance-based payment as 90 percent of the value of the completed milestones identified in paragraph G.4, less the sum of all previous performance payments made by the Government under this contract.  Any amount computed as earned but not paid is defined as retention.

G.3.3.3.         [Orig]  Liquidation.  Except as provided in the Termination for Convenience of the Government clause, all performance-based payments shall be liquidated by deducting from any payment under this contract the unliquidated performance-based payments, or 90 percent of the amount invoiced, whichever is less.  The Contractor shall repay to the Government any amounts required by a retroactive price reduction, after computing liquidations and payments on past invoices at the reduced prices and adjusting the unliquidated performance-based payments accordingly.  The Government reserves the right to unilaterally change from the ordinary liquidation rate to an alternate rate when deemed appropriate for proper contract financing.

G.3.3.4.         [Orig]  Retention.  Unless otherwise determined by the Contracting Officer, the Government will:

G.3.3.4.1.         [Orig]  For CLIN 1002, at the end of six months after acceptance of all components of the evidence/basis of payment for a milestone identified in paragraph G.4, pay the retention for that milestone.

G.3.3.4.2.         [A00001]  For CLINs x003, at the end of the first 18 months of the warranty period for each RB-M, make payments of one-half of the amounts held as retention.  In accordance with E.3.2., upon final acceptance of the RB-M, final settlement on the retained amount will be made less any amounts withheld for warranty extensions.  Upon final acceptance of the RB-M (as defined in E.3.2), at the expiration of all warranty periods and the resolution of any outstanding warranty claims, final settlement on the retained amount will be made.

G.3.3.4.3.         [A00059] For CLINs x003yc, x003yd, and x003yp, no contractual retainage requirements are applicable.

G.3.3.5.         [A00059]  For CLINs x003yc and x003yd, when changes are incorporated for Hulls that have already been delivered or are under construction where milestones have previously been paid, retroactive adjustments associated with the priced changes are payable upon Modification execution.  The contractual retainage requirements are not applicable.

G.3.4.        [A00021]  Time and Materials CLINs x006 and x007 (where x equals the price period) and CLIN 2009 and CLIN 3009.

G.3.4.1.         [Orig]  In addition to the general requirements above and the requirements of FAR 52.232-7, Payments under Time-and-Materials and Labor-Hour Contracts, incorporated at Section I.1, for invoices against Time and Materials CLINs, include the following additional data on the invoice:

G.3.4.1.1.         [Orig]  A breakdown of labor charges by labor hours and classification.

G.3.4.1.2.          [Orig]  A breakdown of direct materials costs and other direct costs, if any, to include all material expenditure, less any discounts taken.

G.3.4.1.3.         [Orig]  Cumulative value of all invoices against the delivery/task order to date.

G.3.4.2.         [Orig]  Computation of amounts.  Unless the Contractor requests a smaller amount, the Government will compute each time and materials payment as the value of the amount(s) invoiced for time and materials CLINs less 5 percent, provided that not more than $50,000 per order has already been retained.  Any amount earned but not paid is defined as retention.

G.3.4.3.         [Orig]  Liquidation.  Except as provided in the Termination for Convenience of the Government clause, all time and material payments shall be liquidated by deducting from any payment under this contract the unliquidated time and material payments, or 95 percent of the amount invoiced, whichever is less.  The Contractor shall repay to the Government any amounts required by a retroactive price reduction, after computing liquidations and payments on past invoices at the reduced prices and adjusting the unliquidated time and materials payments accordingly.  The Government reserves the right to unilaterally change from the ordinary liquidation rate to an alternate rate when deemed appropriate for proper contract financing.

G.3.4.4.         [Orig]  Retention.  The Government will, at the end of the period prescribed by FAR 52.232-7, pay the retention.

G.3.5.        [Orig]  Cost Plus Fixed Fee CLINs x008 (where x equals the price period).

G.3.5.1.         [Orig]  The Government will make payments to the Contractor, subject to and in accordance with the FAR Clause 52.216-8, Fixed Fee, incorporated at Section I.1.  Such payments shall be equal to the allowable cost and proportional fee (allowable costs times fee dollars divided by estimated cost dollars) of each invoice submitted by and payable to the Contractor pursuant to the FAR Clause 52.216-7, Allowable Cost and Payment, incorporated at Section I.1, subject to the withholding terms and conditions of the Fixed Fee clause, as applicable.  Total fee(s) paid to the Contractor shall not exceed the fee amount(s) set forth in this contract.

G.3.5.2.         [Orig]  For invoices against the Cost Plus Fixed Fee CLINs, include the following additional data on the invoice:

G.3.5.2.1.         [Orig]  A breakdown of costs by job, as applicable, including:

G.3.5.2.1.1.         [Orig]  materials costs and other direct costs,

G.3.5.2.1.2.         [Orig]  indirect costs.

G.3.5.2.2.         [Orig]  Fee, supported by calculations in accordance with G.3.5.1.

G.3.5.2.3.         [Orig]  Cumulative value of cost and fee for all invoices against the delivery/task order to date.

G.3.5.3.         [Orig]  Computation of amounts.  Unless the Contractor requests a smaller amount, the Government will compute each cost plus fixed fee payment as the value of the amount(s) invoiced for cost plus fixed fee CLINs less 15 percent of the fee invoiced, provided that not more than $100,000 per order has already been retained.  Any amount earned but not paid is defined as retention.

G.3.5.4.         [Orig]  Liquidation.  Except as provided in the Termination for Convenience of the Government clause, all cost plus fixed fee payments shall be liquidated by deducting from any payment under this contract the unliquidated cost plus fixed fee payments, or 85 percent of the amount invoiced, whichever is less.  The Contractor shall repay to the Government any amounts required by a retroactive price reduction, after computing liquidations and payments on past invoices at the reduced prices and adjusting the unliquidated cost plus fixed fee payments accordingly.  The Government reserves the right to unilaterally change from the ordinary liquidation rate to an alternate rate when deemed appropriate for proper contract financing.

G.3.5.5.         [Orig]  Retention.  The Government will, at the end of the period prescribed by FAR 52.216-8, pay the retention.

G.4        [Orig]  BASIS OF PAYMENTS FOR PERFORMANCE-BASED PAYMENTS

G.4.1.        [A00001]  Pursuant to FAR clause 52.232-32, "Performance-Based Payments", incorporated at Section I.2, the following milestones are established for performance-based payments for certain CLIN deliverable items, subject to the retention identified at paragraph G.3.3.2.  For CLIN 1002, the deliverable item is the entire CLIN.  For CLIN x003, the deliverable item is an individual RB-M identified by hull number.    Milestones are designated either as Severable or Cumulative.  A Milestone is considered complete when the evidence/basis for payment is accepted and approved by the Contracting Officer.  The evidence/basis for payment is the objective measure for completing the milestone, such as an approved final data deliverable required by a CDRL, a report documenting engine tests, or a signed DD-250 acknowledging preliminary acceptance of an RB-M.  The evidence/basis for payment for Milestones with subordinate elements shall be the evidence/basis for payment of all subordinate elements.  Milestones designated as Severable may be paid independent of the completion of other milestones at the same level.  Milestones designated as Cumulative are listed in order of dependency and may not be paid until all previous dependent milestones at the same level have been completed.

G.4.1.1.         [A00056]  CLIN 1002, Detailed Design Review:

Original CLIN 1002 Effort                                              $7,934,632

 Milestone

% Value

Severable /
Cumulative

Evidence/Basis for Payment

1.  Post-Award Conference / Teaming Agreement

10%

Severable

Teaming Agreement with Kvichak

Teaming Agreement with EDO

Teaming Agreement between Kvichak and Camarc

Minutes from Post-Award Conference

Submission of CDRL 090-001, Quality Management Plan

2.  Design Review #1

15%

Severable

Submission of minutes from Contract Read-through Session

PDF of Camarc loft drawings

Submittal of:

041-001 Technical Information Management and Control Plan (including ISM implementation plan/schedule)

077-001 Accident Prevention Plan

085-003 Drawing Nbr Assign Rpt

3.  IBR

9%

Severable

Submittal of:

041-003 CWBS

041-004 IMP

041-005 IMS

041-006 Contract Performance Rpt

068-001 SEMP

070-004 Fire Flooding Des We Plan

096-001 Weight Control Plan

4.  CDRL 068-003, Allocated Configuration Baseline

1%

Severable

Approval1 of CDRL

5.  Design Review #2

9%

Cumulative

Submission of:

043-001 LCCE 1st Submission

068-002 CMP

079-001 Stability Analysis (DR Phases)

086-002 Tech Data Index

088-001 HSI

300-001 ELA (DR Phases)

Schedule of ISM Requirements Specification Document Processes as described in Proposal Section 3.9.2.

Submittal of Design Review Minutes

6.  Design Review #3

8%

Cumulative

Submittal of:

076-005 Maintenance Data Org Plan

085-001 3D Model Lazarette and Mock-up of Lazarette (DR Phases)

085-004 Calculations (DR Phases)

085-005 MECL Lazarette (DR Phases)

080-001 ISP

086-001 Tech Data Org Plan

Submittal of Design Review Minutes

092-002 Insp Test & Trial Prog Plan

ISM requirements specification document per Task 4 Deliverable in Proposal Section 3.9.2

Data demonstrating contractor development efforts IAW 068-3.1 to meet requirements in Specification and SOW2.

7.  Design Review #4

9%

Cumulative

Submittal of:

085-001 3D Model Engine Room (DR Phases)

with Mock-up

085-004 Calculations (DR Phases)

085-005 MECL for areas listed above (DR Phases)

Data demonstrating contractor development efforts IAW 068-3.1 to meet requirements in Specification and SOW2.

Submittal of Design Review Minutes

8.  Design Review #5

6%

Cumulative

Submittal of:

085-001 3D Model of Aux Machine Space and (DR Phases)

with Mock-up

085-004 Calculations (DR Phases)

085-005 MECL for areas listed above (DR Phases)

Data demonstrating contractor development efforts IAW 068-3.1 to meet requirements in Specification and SOW2

Submittal of Design Review Minutes

9.  Design Review #6

8%

Cumulative

Submittal of:

085-001 3D Model of Survivor Cabin (DR Phases)

with Mock-up

085-004 Calculations (DR Phases)

085-005 MECL for areas listed above (DR Phases)

Data demonstrating contractor development efforts IAW 068-3.1 to meet requirements in Specification and SOW2.

Submittal of Design Review Minutes

10.  Design Review #7

9%

Cumulative

Submittal of:

085-001 3D Model of the Pilot House, (DR Phases)

085-001 3D Model of the Exterior Deck and Mock-up for Each (DR Phases)

085-004 Calculations (DR Phases)

085-005 MECL for areas listed above (DR Phases)

086-004 IETP Style Guide

086-005 IETP Requirements

Submittal of Design Review Minutes

11.  CDRLs 076-001, 097-001, 097-003

1%

Cumulative

Submittal of:

076-001 RAM Analysis

097-001 Incline Experiment Test Plan

097-003 Self Righting Test Plan

12. CDRL 042-002

DR Minutes

.5%

Severable

Submittal of Lessons Learned Meeting Minutes

13. CDRL 085-001

3D Model

2.5%

Severable

Approval1 of:

085-001 3D Model (DR Phases)

14. CDRL 085-002

2D Drawings

3%

Severable

Approval1 of:

085-002 2D Product Drawings (DR Phases)

15. CDRL 085-004 Calculations

1%

Severable

Approval1 of:

085-004 Calculations (DR Phases)

16. CDRL 085-005

MECL

1%

Severable

Approval1 of:

085-005 MECL (DR Phases)

17.  CDRL 086-001 Technical Data Organization Plan

1%

Severable

Approval1 of CDRL

18.  CDRL 076-005 Maintenance Data Organization Plan

1%

Severable

Approval1 of CDRL

19.  CDRL 086-004 IETP Style Guide

1%

Severable

Approval1 of CDRL

20.  CDRL 086-005 IETP Requirements

1%

Severable

Approval1 of CDRL

21.  ISM

3%

Cumulative

Validation of ISM operability.  Based on data that would be included in below examples.  This does not require approval of example CDRLs.

076-003 Maintenance Procedure Cards

083-001 Provisioning Parts List

083-002 Eng Data for Provisioning

083-003 Sparing Recommendations

Footnotes:

1 Evidence/Basis for Payment is an Approval of the submittal by the Government.  If Government CDRL review time for a specific CDRL has expired and the Contractor is otherwise ready to submit Evidence for Payment for the entire milestone, the Government agrees to waive the need to have approval on that CDRL for milestone payment purposes and will allow payment of the entire milestone.

2 Data will be shared with the government in order for the contractor to demonstrate the value added to the project as progress is made in each design review phase.  Examples of this type of data include: Equipment Selection, RCM data, RAM data, calculations, vendor data, iterative demos of ISM/IETP prototype.

CLIN 1002 ECP-009 Effort            Total ECP-009 Value $4,480,708                                         

Milestone

 Value

Severable /
Cumulative

Evidence/Basis for Payment

1.  IETP Status #1

$110,000

Severable

·   IETP Monthly Status Report (June) to include tasks accomplished, tasks to be completed in the next month, and level of effort performed.

·   086-004 IETP Style Guide – DRAFT submittal that demonstrates reasonable progress only.  This submittal is not for USCG formal review or comment.

·   086-005 IETP Requirements –DRAFT submittal that demonstrates reasonable progress only. This submittal is not for USCG formal review or comment.

2.  IETP Requirements Review

$220,000

Cumulative

·   Submittal of 086-004 IETP Style Guide

·   Submittal of 086-005 IETP Requirements

·   Data Module Requirements List (DMRL) –DRAFT submittal that demonstrates reasonable progress, not for formal review

·   Initial IETP Design Documentation IAW SOW 086-2.7.4

·   Submittal of Requirements Review Minutes

3.  IETP Status #2

$66,000

Severable

·   IETP Monthly Status Report (July) to include tasks accomplished, tasks to be completed in the next month, and level of effort performed.

·   Re-submittal of 086-002 Tech Data Index

4.  IETP Design Review #1

$330,000

Cumulative

·   Draft IETP Design Documentation IAW SOW 086-2.7.4

·   Initial DMRL and demonstration of 10% of DMRL to include media-rich technical data, specifically system simulations, photographs and videos used in IETP IAW SOW 086-2.3 as defined by the DMRL

·   Re-submittal of 086-001 Tech Data Org Plan

·   Access to web-based IETP Demonstration Package that includes publication and print of MPCs and the ability to locate a specific part through various modes of navigation.

·   Submittal of Design Review Minutes

5.  IETP Status #3

$22,000

Severable

·   IETP Monthly Status Report (August) to include tasks accomplished, tasks to be completed in the next month, and level of effort performed.

6.  IETP Design Review #2

$264,000

Cumulative

·   Re-submittal of 086-002 Tech Data Index

·   Updated Draft IETP Design Documentation IAW SOW 086-2.7.4

·   Update of DMRL and demonstration of 35% of DMRL to include media-rich technical data, specifically system simulations, photographs and videos used in IETP IAW SOW 086-2.3 as defined by the DMRL

·   Technical Data In Process Review – Organizational Maintenance Manual and Operator Handbook

·   Web-based IETP Demonstration Package update

·   Submittal of Design Review Minutes

7.  IETP Status #4

$22,000

Severable

·   IETP Monthly Status Report (September) to include tasks accomplished, tasks to be completed in the next month, and level of effort performed.

8.  IETP Status #5

$22,000

Severable

·   IETP Monthly Status Report (October) to include tasks accomplished, tasks to be completed in the next month, and level of effort performed.

The Milestones below are based upon the negotiated outcome of ECP-009 less the amount of previous milestone values for ECP-009. 

9.  IETP Design Review #3

$1,307,880

Cumulative

·   Updated Draft IETP Design Documentation IAW SOW 086-2.7.4

·   Update of DMRL and demonstration of 60% of DMRL to include media-rich technical data, specifically system simulations, photographs and videos used in IETP IAW SOW 086-2.3 as defined by the DMRL

·   Technical Data In Process Review – Organizational Maintenance Manual, Operator’s Handbook, TRS Manual

·   Web-based IETP Demonstration Package update

·   Submittal of Design Review Minutes

10.  IETP Status #6

$96,880

Severable

·   IETP Monthly Status Report (November – due 12/10/07) to include tasks accomplished, tasks to be completed in the next month, and level of effort performed.

11.  IETP Status #7

$96,880

Severable

·   IETP Monthly Status Report (December – due 01/10/08) to include tasks accomplished, tasks to be completed in the next month, and level of effort performed.

12.  IETP Design Review #4

$678,160

Cumulative

·   Final IETP Design Documentation IAW SOW 086-2.7.4

·   Technical Data In Process Review – Organizational Maintenance Manual and TRS Manual

·   Web-based IETP Demonstration Package update

·   Submittal of Design Review Minutes

13.   Validate IETP Operability, Phase 2 Functionality

$261,576

Cumulative

·   Validation of the IETP operability as defined in the TDOP (086-001). 

14.   Validate MPC Cards – Phase 1

$43,596

Severable

·   Validation of all Daily, Weekly, Monthly and Quarterly Maintenance Procedure Cards.  Based on results of Contractor validation procedures conducted IAW SOW 086-2.4.1

15.   Update and Demonstration of DMRL

$387,520

 

Severable

·   Update of DMRL and demonstration of 90% of DMRL to include media-rich technical data, specifically system simulations, photographs and videos used in IETP IAW SOW 086-2.3 as defined by the DMRL

16.  IETP Status #8

$96,880

Severable

·   IETP Monthly Status Report to (January – due 02/10/08) include tasks accomplished, tasks to be completed in the next month, and level of effort performed.

17a.  Operators Handbook Delivery

$43,596

Severable

Milestone Terminated for Convenience of the Government

17b. Org Maintenance Manual Delivery

$0

Milestone Terminated for Convenience of the Government

17c. BCMP Delivery

$0

Milestone Terminated for Convenience of the Government

17d. Tech Repair Standards Delivery

$0

Milestone Terminated for Convenience of the Government

17e. IETP Support Documentation

$0

Milestone Terminated for Convenience of the Government

17f. ISM/IETP Final Delivery

$0

Milestone Terminated for Convenience of the Government

18.  IETP Status #9

$96,880

Severable

·   IETP Monthly Status Report (February – due 03/10/08) to include tasks accomplished, tasks to be completed in the next month, and level of effort performed.

19.  IETP Status #10

$96,880

Severable

·   IETP Monthly Status Report (March – due 04/10/08) to include tasks accomplished, tasks to be completed in the next month, and level of effort performed.

20.  Final Operator’s Handbook Approval

$0

Milestone Terminated for Convenience of the Government

21.  Final Org Maint Manual Approval

$0

Milestone Terminated for Convenience of the Government

22.  Final BCMP Approval

$0

Milestone Terminated for Convenience of the Government

23.  Final Tech Repair Standards Manual Approval

$0

Milestone Terminated for Convenience of the Government

24. IETP Data Validation

$0

Milestone Terminated for Convenience of the Government

25.  Media-rich Content Delivery

$0

Milestone Terminated for Convenience of the Government

26. Validate MPC Cards – Phase 2

$0

Milestone Terminated for Convenience of the Government

27. ISM/IETP Phase 3 Functionality 

$0

Milestone Terminated for Convenience of the Government

28. Content Management Tool Initial development, delivery of testing environment

$87,192

Cumulative

·   Initial delivery of CMT with ability to add new, edit, and publish data modules, publication modules, and illustrations.

29. Content Management Tool Development Completion, delivery to production environment

$130,788

Cumulative

·   Delivery of CMT with ability to add new, edit, and publish data modules, publication modules, and illustrations.  Represented by successful delivery to production IETM environment.

·   1 Evidence/Basis for Payment is an Approval of the submittal by the Government.  If Government CDRL review time for a specific CDRL has expired without response, the Government agrees to waive the need to have approval on that CDRL for milestone payment purposes.

 

 

 

 

G.4.1.2.         [A00059]  CLIN x003, RB-M (where x equals the price period) and CLIN x003yc or x003yd RB-M Post Award Changes (where y equals the associated hull SubCLIN)

Number

Milestone

% of CLIN

Severable /
Cumulative

Evidence of Payment

1

Initiate Production

5%

Severable

Purchase Order Issued for Engines and Jets

2

Fabrication Kits

25%

Severable

Receipt of Hull/Superstructure (Bottom/Main deck/Pilot House) Plate Kits at Production Facility

3

Initiate Sub-Assemblies and Extruded Aluminum Materials

15%

Severable

Receipt of Jets and Extruded Aluminum Material (Bulb Flats, Flat bar, Tees, Pipe)

4

Backbone

10%

Cumulative

Backbone landed in 3D Hull Jig

5

Joiner Deck and Hull Assemblies Complete

15%

Cumulative

Contractor QA Report for accepted weld of the Joiner Deck and Hull Assemblies

6

Pilot House Joined to Deck Assembly

15%

Cumulative

Contractor QA Report for accepted weld of the Pilot House to the Deck Assembly

7

Launch

10%

Cumulative

Boat is launched into the water

8

Preliminary Acceptance/Delivery

5%

Cumulative

Signed DD250

G.5        [Orig]  CONTRACTOR REPRESENTATIVES AUTHORIZED TO SIGN DOCUMENTS

Upon execution of the Contract, the Contractor shall provide a list to the Contracting Officer, which identifies the Contractor representative(s) authorized to sign written communications on behalf of the Contractor.  The report shall specifically contain the following:  (1) name of individual authorized to sign Contractor-generated technical data and Contractor management type documentation, and (2) type of documentation each individual is authorized to sign.  Upon addition or deletion of one or more names, the list shall be revised accordingly.

G.6        [A00059]  RESPONSIBLE OFFICIAL(S) WHO CAN RECEIVE NOTIFICATION OF AN IMPROPER INVOICE AND ANSWER QUESTIONS REGARDING THE INVOICE

For use in the event your firm receives a contract as a result of this solicitation, designate the responsible official(s) who can receive notification of an improper invoice and answer questions regarding this invoice.

Name:

Marilyn Whitehead

Title:

Contracts Manager

Address:

Marinette Marine Corporation

 

1600 Ely Street

 

Marinette, WI  54143

Telephone/Fax             Number:

(715)735-9341 Ext. 6392 phone
(715)735-3516 fax

E-Mail Address:

marilyn.whitehead@us.fincantieri.com

G.7        [Orig]  ACCOUNTING AND APPROPRIATION DATA

The accounting and appropriation data for this contract is provided in summary by Attachment 7 to Section J.  This tracking document is updated on the RB-M Contract website after each Contract obligation through a Task Order or Delivery Order.